Cookie Preferences

We use cookies to provide a better user experience and personalised service. By consenting to the use of cookies, we can develop an even better service and will be able to provide content that is interesting to you. You are in control of your cookie preferences, and you may change them at any time. Read more about our cookies.

Skip to content

On Friday, September 26, our customer service will exceptionally be open from 12:30 p.m. to 3:00 p.m.

Technical instructions for the electricity network

Within Herrfors Nät-Verkko’s distribution area, contractors must comply with the up-to-date technical requirements and instructions when connecting to the electricity network or carrying out modification work. On this page you will find all the necessary documents and instructions related to the low- and medium-voltage network.

Common practices ensure safety and smooth operations

The instructions include, among other things:

  • Connection requirements (for low- and medium-voltage networks)
  • Connection diagrams and example connections
  • Principles of metering and connections
  • Protection requirements (e.g. main fuses, overcurrent protection)
  • Construction requirements (placement of switchboards, cabling)
  • Conditions and documentation for commissioning inspections

The objective is:

  • A safe and standard-compliant connection to the network
  • Smooth compatibility with measurement and control systems
  • Ensuring common practices regionally
     

Download the instructions

Contact technical customer service

If you need more information or guidance in an exceptional situation, please contact our technical customer service.

  • Email: info@herrfors.fi
  • Mobile: (06) 781 5300
  • Location: Kauppiaankatu 10, 68600 Pietarsaari
  • Location: Rehutie 1, 84100 Ylivieska