We use cookies to provide a better user experience and personalised service. By consenting to the use of cookies, we can develop an even better service and will be able to provide content that is interesting to you. You are in control of your cookie preferences, and you may change them at any time. Read more about our cookies.

Skip to content

On Friday, September 26, our customer service will exceptionally be open from 12:30 p.m. to 3:00 p.m.

Change of fuse size at the usage site

Add more electrical power – or adjust it to fit your needs 

How fuse size changes are made

Submit fuse size change electronically

To request a fuse size change, you can use the available electronic service form. After submitting the form, the electrical contractor will contact you and handle the process. 

The network service product is determined by fuse size

The network service product in use at the usage site is based on the fuse size. A larger size allows for greater power capacity, and a smaller fuse size may reduce the network service fee.

Frequently asked questions about fuse sizes

What is the difference between a usage site and a connection? 

A connection is the entire property’s electricity supply from the power grid. Its capacity is limited by so-called main fuses. 

  • A usage site is an individual metering point within the connection – such as an apartment or building. 

One connection may include multiple usage sites (e.g. in a row house, each unit is its own usage site). 

Can I change the fuse size myself? 

No. The modification must always be done by an authorized electrical contractor. They ensure safety and submit the necessary notifications. 

Does the change require a meter replacement? 

Generally, no. If the meter is not compatible with the new fuse size, Herrfors will replace it free of charge. 

How quickly is the change made? 

Typically within 3–5 business days after the contractor’s notification.

Does changing the fuse size cost anything? 

We do not charge for the change if it stays within the technical limits of the current connection and doesn’t require a meter replacement. Your electrical contractor will invoice their work separately. 

  • When more electricity is needed in the home or property, for example for electric vehicle charging or a new heating system, it may be necessary to change the fuse size at the usage site. On the other hand, the fuse size can also be reduced if the power demand has decreased.
  • The fuse size at the usage site determines how much electricity can be used simultaneously – but the change is always made within the capacity limits of the existing electricity connection.

What is a usage site and what does fuse size mean? 

  • A usage site is an individual electricity metering point, such as an apartment, house, or commercial space.
  • The fuse size defines the available power at the usage site. 
  • A connection is the link between the power grid and the property through which electricity is delivered. One connection can serve multiple usage sites – for example in row houses or apartment buildings.

Important:
The fuse size of a usage site can only be changed if the change fits within the technical limits of the connection. Changing the fuse size does not alter the capacity of the electricity connection and does not require new cabling.